EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
phowe
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (415)
Research
- (1)
-
AD's and FB post
Workshop
- (2)
-
Clean up
-
Getting Organized...
Empennage
- (2)
-
Removed Vertical...
-
Worked on the...
Fuselage
- (71)
-
Windshield and Skylight
-
Windshield and Skylight
-
Windshield and Skylight
-
Ribs for Skylight...
-
Rear Fairing
-
Patch Hole in bottom...
-
Doors
-
Doors
-
Tail Station Closeout
-
Belly Fairings
-
Belly Fairings
-
New Header Tank
-
Install windows in...
-
Trimmed Wing...
-
Station 10 and 11...
-
Reattached the boot...
-
Added more rivet...
-
Boot Cowl, Attach...
-
Boot Cowls
-
2 more coats of...
-
Top Boot Cowl Skins...
-
Floorboard
-
Side Boot Cowls
-
Floorboard
-
Bottom Cowl skin
-
Firewall
-
added missing...
-
Installed bottom and...
-
Rivet call outs
-
Taped stringers to...
-
Rivet hole locations...
-
Trimmed the side...
-
Fitted, Trimmed and...
-
Started to fit side...
-
Flipped the fuselage...
-
Cut the stringers...
-
Flipped Fuselage and...
-
Finished riveting...
-
Rivet top skins to...
-
Tailcone skins
-
Tailcone stringers...
-
Front Top Skins
-
Front Tailcone Top...
-
Fitting top skins...
-
Interior - Baggage...
-
Test glued a piece...
-
Edged the bottom of...
-
S4 Closeout
-
S4 Closeout
-
Clecoed top skins to...
-
Edged the Top skins
-
Window Supports (S3...
-
Fabricating window...
-
Drilled the locking...
-
Assembled Rudder pedals
-
Baggage Area
-
Worked on the aft...
-
Rudder pedals
-
Worked on assembling...
-
Work on the Baggage...
-
Rudder cables
-
Tailcone to Fuselage...
-
Cage to tail-cone work
-
Mounting cage to the...
-
Tailcone - riveted...
-
Side and top...
-
Attached the station...
-
Tailcone - riveted...
-
Tailcone - Bottom...
-
Fuselage Stations
Firewall
- (11)
-
Final Rivets in...
-
Electrical Passthrough
-
Interference of...
-
Battery Box and...
-
Additional Items on...
-
Start to hang...
-
Inventory FWF Kit
-
Finished Riveting of...
-
Inserted spacers...
-
Temp Attached and...
-
More Coats of Truck...
Tail Feathers
- (37)
-
Electrical to the...
-
Attached the Elevator
-
Vertical Stabilizer
-
Installed Horizontal...
-
Mounted Vertical...
-
Installed The rudder
-
Horizontal...
-
Vertical Stab Cap
-
End Caps for...
-
Vertical Stabilizer Cap
-
Trim Motor
-
Trim Motor Cover
-
Attached Rudder
-
Mounted trim servo...
-
Rudder horn and...
-
Reinstalled the...
-
Attached the rudder...
-
Vertical Stabilizer
-
Horizontal...
-
Took the wing tips...
-
Horizontal Stabilizer
-
Attached Rudder to...
-
Elevator - Finished...
-
Riveted Missing...
-
Elevator
-
Continued work on...
-
Trim tab hinges
-
Bent and installed...
-
Elevator
-
Horizontal Stabilizer
-
Rans Fix for over...
-
Horizontal Stabilizer
-
Horizontal Stabilizer
-
Trim Tab
-
Elevator and Trim...
-
Vertical Stab and...
-
Rudder - OSH
Wings
- (86)
-
Wing root Gap Seal
-
Hung 1 Flap
-
Temporary Hung Wing...
-
Ailerons
-
Matched drilled...
-
Mounted Wings
-
Ailerons, Flaps and...
-
Installed Return...
-
Wing Fuel Tank...
-
Balanced Rebuilt...
-
Pitot Tube
-
Balancing the Right...
-
Remanufactured Right...
-
Finished balancing...
-
Balance left Aileron
-
Wing to Fuselage...
-
Left Wing Strut Fairing
-
Wing Tips
-
Wing Tips
-
Strut Fairing
-
Wing to Strut Fairing
-
Aerosport Wing Tips
-
New Wing tips
-
Reattached the strut...
-
Strut Mounting brackets
-
Removed wings
-
Tighten all the...
-
Hung the wings
-
Struts
-
Replaced incorrect...
-
Attached Wing Tips
-
Wing tips - Project...
-
Wing tips - Project...
-
Wing tips - Project...
-
Wing tips - Project...
-
Wing tips - Project...
-
Wing tips - Project...
-
Wing tip - part from...
-
Wing Struts
-
Wing tips - Project...
-
Pro Sealed fuel cap...
-
Rivet Left wing...
-
Installed fuel tanks...
-
Wing tips - Project...
-
Fuel Tank
-
Continued working on...
-
Fuel Tanks
-
Wing tips
-
Fuel Tanks
-
Recreated Pitot tube...
-
Right Fuel Tank
-
Pitot Support
-
Finished off left...
-
Finished Skins Right...
-
Attaching skin to...
-
Transferred right...
-
Assembled wing jig
-
Gap seal...
-
Installed gap seal...
-
Finished ailerons...
-
Ailerons and flaps
-
Aileron and Flaps
-
Wings
-
Attached bellcranks...
-
Work on left wing
-
Riveted Ribs to Spars
-
Riveted Hinge...
-
Cut out wing shaping...
-
laid out ribs and...
-
Left wing strut...
-
Installed strut...
-
Installed strut...
-
Drilled and...
-
Optional landing lights
-
Locating wing ribs...
-
Optional Landing...
-
Bell Crank
-
Finished Riveting of...
-
Right wing spars
-
Aileron and Flap...
-
Began Work on...
-
Front and Back Spar.
-
Shaped the flaps and...
-
Cut the tabs off of...
-
Pulled and...
Controls
- (11)
-
Cable Blocks
-
Fixed the Pitch of...
-
Rudder Travel
-
Elevator Push/Pull Rod
-
Tighten Rudder Cables
-
Parking Brake
-
Flap Handle
-
Installed Aileron...
-
Autopilot servo mount
-
Elevator push/pull rod
-
Rudder cables...
Avionics
- (30)
-
Antennas
-
Antennas
-
Installed Outside...
-
Connecting Wiring To...
-
Wiring
-
Wiring
-
Continued Attaching...
-
Avionics Connected...
-
Wiring
-
A Connector GPS Wire
-
Wire Routing Planning
-
Doubler For ELT Antenna
-
Antennas
-
Autopilot Pitch Servo
-
Roll Servo Installed
-
Pitch Autopilot Servo
-
Moved transponder
-
Mounted the Radio
-
Mounted More Avionics
-
ELT Tray
-
ELT
-
Picked up Panel from...
-
Finished tailcone...
-
Wiring
-
Static ports were...
-
ADAHRS
-
ADSB and Transponder...
-
Planning and Ordering
-
Created the ADHARS...
-
Visited Advanced...
Lighting
- (13)
-
Wingtip Nav and...
-
Installed Connector...
-
Finished Installing...
-
Updating Schematics
-
Light on the Rear of...
-
Pins on the Nav Lights
-
Installed Landing...
-
Landing lights
-
Wing Tip lights
-
Wiring
-
Wiring to ACM module
-
Wires for the Lights
-
Routing of Wiring.
Instrument Panel
- (6)
-
Air Temperature Sensor
-
Installed Throttle...
-
Middle Stack
-
Installation of...
-
Worked on Mounting...
-
Preliminary Work to...
Landing Gear
- (16)
-
Nose Gear Tire
-
Nose Gear - Mount...
-
Main Gear Fuselage...
-
Nose Gear Yoke
-
Front Landing Gear
-
Attached the tundra...
-
Tundra Tires ready...
-
Inserted Innertubes...
-
Separated Rims from...
-
Separate the wheels
-
Convert to Tundra Gear
-
Brake line
-
Installed Optional...
-
Wheels and Mounting
-
Landing Gear
-
Started work on the...
Engine
- (30)
-
Wiring
-
Changed Grounds around
-
Wire Testing Fixture
-
Created another...
-
Wiring
-
Discussion on how to...
-
Additional Ground...
-
Attached Adelle...
-
Engine Wiring
-
Cabin Heater Hoses
-
Engine Electrical.
-
Heater Hose connections
-
Engine Electrical
-
Wiring On the Engine
-
Wiring
-
Connection of...
-
Heat shields and...
-
Oil Thermostat
-
Engine Oil Thermostat
-
Modified cowl for...
-
Fitting Cowl
-
Cowl - Exhaust Hole
-
Completed the...
-
Assembled the Oil...
-
Intercooler Scoop...
-
Engine Cowl
-
Mounting Engine...
-
Cowl
-
Mounted Engine
-
Cowl
Propeller
- (7)
-
Ordered New prop Bolts
-
Sanded Foot of Prop
-
Tried to Set the...
-
Spinner Cut and Mounted
-
Mounted Prop
-
Installing Prop Hub
-
Installing Prop
Fuel System
- (18)
-
Trimmed Brackets...
-
Attached Fuel lines...
-
Electric Fuel Pump
-
Installed Header Tank
-
Header tank
-
Header Tank
-
Header Tank
-
Header Tank
-
Looking for Parts...
-
Looking for Parts...
-
Header tank
-
Header tank
-
Header Tank
-
Header
-
Header Tank
-
Header tank
-
Header tank
-
Header Tank
Interior Finish
- (46)
-
Vents
-
Rudder Return Kit
-
Rudder Return Kit
-
Rudder Return Kit
-
Side Seat Closeout
-
Plastic Seat Closeouts
-
Control Cable Closeout
-
Control Column...
-
Baggage Area Floor
-
Flap Handle Closeouts
-
Side Closeouts
-
Flap Handle Issue
-
Baggage Area Floor
-
Side closeout Next...
-
Flap Handle
-
Doors
-
Flap Handle
-
Plastic Station 3...
-
Fluid connection to...
-
Cabin Heater
-
Heater
-
Cabin Heater
-
Doors
-
Doors
-
Brakes
-
Doors
-
Located parts for...
-
Test fitted/...
-
Match drilled...
-
FINISH SEAT
-
Assembly of control...
-
Baggage Area skins
-
Seats
-
Seat
-
Assembly of control...
-
Cloth on baggage...
-
Second Seat
-
2nd Seat
-
Seats
-
Seats
-
Seat rails
-
seats
-
Started to work on...
-
Constructing seats
Rigging
- (6)
-
Rerigged Ailerons
-
Ailerons
-
Flap cable
-
Connected Aileron...
-
Rudder Cables
-
Tightened Rudder Cables
Paint / Decals
- (10)
-
Painted aileron and...
-
Misc Parts were Painted
-
Wings
-
Wings
-
WIngs
-
Preparing Wings for...
-
.Priming
-
Prepared the Boot...
-
Painted Internal...
-
Interior items to be...
Inspection
Tools
MISC
- (12)
-
Schematics
-
Schematics
-
Schematics
-
Engine Mount Nose...
-
Searching
-
Drill bits
-
Find all the parts
-
RESTART BUILD AFTER...
-
Not a productive day!
-
Header Tank
-
Shot for balancing...
-
Sick as a dog
Builder Name:
Philip Howe
-
Project:
Rans - S-21 Outbound
-
VIEW REPORTS
Total Hours:
1711.75
Total Flight Time:
6
Total Expense:
N/A
Start/Last Date:
Oct 19, 2020 - No Finish Date
Engine:
Rotax 915is
Propeller:
Whirlwind
Panel:
Dynon
Friendly URL:
https://eaabuilderslog.org?s=phowe
Home or Last Project Picture
Sep 13, 2023
Nose Gear Yoke
- (2 hours)
Category: Landing Gear
We finished the assembly and mounted the nose gear tundra tire yoke.
IMG_6468.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.